Courtesy Navigation
Site Index Contact Port of Portland Port of Portland Home page Airports Home Marine Home Inside the Port Home
 
 
 
About the Port
Job Opportunities
Newsroom
Photo Gallery
Community Outreach
Community Events
Directions and Map
Leadership
Commission Information
Environmental Programs
Strategic Plan and Budget
Audit Reports
Ordinances, Policies and Rules
Construction Master Specifications and Design Guidelines
Business Opportunities
Active Bids and Proposals
Future Construction Contracts
Small Business Development Program
Projects, Plans and Studies
West Hayden Island
Willamette River Dredged Material Management Plan
Trade and Transportation Studies
Properties
Noise Management
spacer
Mitigation Sites
Mitigation Sites
Mitigation Sites
spacer Download flash Ramsey Lakes Mitigation Site

Background
Ramsey Lakes Mitigation SiteA number of mitigation projects were identified in the 1988 "Cooperative Agreement" between agencies, which was brokered to "Establish a Rivergate development program and an acceptable mitigation program for wetland impacts." The agreement was between the Oregon Department of State Lands (DSL), the Oregon Department of Fish and Wildlife, the Environmental Protection Agency, the Army Corp of Engineers, the U.S. Fish and Wildlife Service and the Port of Portland. The Cooperative Agreement established mitigation obligations for the Port's planned development of the Rivergate industrial area and included the establishment of Ramsey Lake wetlands. The agreement has now been superceded by the Rivergate Consent Decree signed on January 31, 2001.

Mitigation Plan
Ramsey Lakes wetlands consists of three separate ponds with a total of at least 16 acres of water surface area. Construction was completed in 1990 and material removed from the lakes was used for construction of adjacent fill dikes and/or islands, or used to enhance upland soil before planting. The wetland fringe and islands associated with the ponds were planted with native vegetation following construction.

Status
Monitoring, which was required for three years, was completed in 1993 but continues on an annual basis, which is a standard procedure for completed Port mitigation sites. Plantings installed along the western slope in 2001 have become established and help to provide a buffer from the railroad and adjacent property. On the east side of the lakes, the Port conducted improvements of a meadow area that may provide nesting habitat for birds and reptiles. The meadow buffer, as it’s called, was mowed, disked, spot-sprayed and seeded with native species in 2003. The Port continues to manage and maintain these areas for invasive species control and native plant establishment.  

spacer
Buffalo Street Site
Columbia Slough Re-vegetation
Elrod Road Site
Jewett Lake
Northwest Swale, Vanport Wetlands
PIC Corps of Engineers Mitigation Site
PIC E-Zone Enhancement Planting
Riverbank Sites
Rivergate Enhancement Site
Ramsey Lakes Mitigation Site
Randall Site
T-5 Powerline Site
Vanport Wetlands
West Hayden Island
West Wye Mitigation Site